Why Our Low-Voltage Takeoffs Hold Up

Low-voltage systems can span the entire building and often contain multiple cable and device types.
We review technology plans, electrical plans, reflected ceiling plans, riser diagrams, equipment schedules, details, and specifications to identify each system and quantify its associated infrastructure.

Coordination Across Communications Systems

Low-voltage systems coordinate with electrical power, ceilings, walls, security, fire alarm, access control, IT rooms, equipment racks, and architectural layouts.
We coordinate available MEP and technology documentation to identify device locations, cable pathways, equipment rooms, racks, cabinets, and other system requirements.

Data & Network Cabling Takeoff

Structured cabling can include Category 5e, Category 6, Category 6A, fiber optic, and other specified communications cabling.
Quantities can be separated by cable type, outlet, pathway, and documented routing.

Communications Room Takeoff

Telecommunications and IT rooms may contain racks, cabinets, patch panels, cable management, backboards, and other infrastructure.
These components can be quantified separately from horizontal and backbone cabling.

Pathways & Cable Support

Low-voltage pathways may include cable trays, J-hooks, conduit, sleeves, raceways, and other support systems.
Where documented, these components can be included in the takeoff.

Related Services

For the complete scope of related estimating services, visit our main MEP page.

What Is Included in Your Low-Voltage & Communications Estimate

  • Data outlets
  • Voice outlets
  • Network cabling
  • Category cable
  • Fiber optic cable
  • Coaxial cable
  • Patch panels
  • Data racks
  • Cabinets
  • Cable trays
  • Cable pathways
  • J-hooks
  • Raceways
  • Conduit where applicable
  • Faceplates
  • Data modules
  • Network equipment where specified
  • Telecom room equipment
  • Backboards
  • Communications grounding
  • Sleeves
  • Labels
  • Cable management
  • Connectors
  • Accessories
  • Material waste
  • Material pricing
  • Installation labor
  • Editable Excel takeoff